翻訳と辞書
Words near each other
・ Sant Miquel del Fai
・ Sant Mori
・ Sant Muktabai Sahakari Sakhar Karkhana
・ Sant Nirankari Mission
・ Sant Nirmala
・ Sant Omer
・ Sant Pau
・ Sant Pau (restaurant)
・ Sant Pau de Fontclara
・ Sant Pau de Segúries
・ Sant Pau del Camp
・ Sant Pau – Dos de Maig (Barcelona Metro)
・ Sant Pere
・ Sant Boi
・ Sant Boi (Llobregat–Anoia Line)
Sant Boi Bridge
・ Sant Boi de Llobregat
・ Sant Boi de Llobregat Museum
・ Sant Boi de Lluçanès
・ Sant Carles de la Ràpita
・ Sant Carles de Peralta
・ Sant Cebrià de Vallalta
・ Sant Celoni
・ Sant Charandas
・ Sant Climent de Llobregat
・ Sant Climent de Taüll
・ Sant Climent Sescebes
・ Sant Corneli
・ Sant Cugat
・ Sant Cugat (Barcelona–Vallès Line)


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Sant Boi Bridge : ウィキペディア英語版
Sant Boi Bridge

The Sant Boi Bridge is the first steel structure in the high-speed railway joining the city of Madrid and Barcelona.
The 2854 ft (870 m) long bridge is very close to the international airport of Barcelona. This high speed railway viaduct is in concept similar to Llinars Bridge but with a different geometry, is a combination of feasibility, technology, aesthetics and integration in the territory.
The bridge crosses several existing infrastructures (highway, road and railway). The bridge is about 15 km from Barcelona.
==Description==

The proposed viaduct consists of two distinct sections:
• Stretch with board-mixed concrete steel between PK 100 +469,155 +129,155 100, with a total length of 340 m which is constructed by pushing panel lintel.
• Tranche with prestressed concrete deck between PK 100 +999,155 +469,155 100, with a total length of 530 m with a board built by autocimbra vain vain.
Due to the proximity to Sants station, the design speed adopted for calculating plot settings are 150 km / h speed limit to 80 km / h minimum speed. The slope adopted maximum elevation is 25 thousandths.
The colour of the bridge was red at first, but Adif decided to use green corporate color, to make it better integrated into the environment.
The steel bridge was built using the launching method. The composite concrete–steel deck consists of 3 ft (1 m) deep parallel transverse I-beams spaced 9 ft (3 m) apart. Longitudinal beams are suspended from curved tied steel box members supported from 37 ft (11.5 m) height steel pylons.
The second 1738 ft (530 m) section, which passes over the Llobregat River, consists of a continuous pre-stressed concrete bridge with a maximum span of 164 ft (50 m). This second section was constructed using regular cast in place concrete method and launching formwork.
The bridges have been modeled using a computer program based on finite element analysis. Special attention has been given to the structural behavior of the bridge under different types of high speed trains crossing the bridge with speeds ranging from 150 km/h to 420 km/h according to Eurocode 1. The maximum acceleration obtained under these high speed moving loads is about 1.8 m/s2 lower than the admissible value according to Eurocode 1. A significant horizontal load due to braking and traction of 7000 KN has conditioned the design of the fixed support at one of the extremes.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Sant Boi Bridge」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.